- Overview
- Product Description
- More product
- Workshop Line
- More picture
- Application Range
- Packaging & Shipping
- FAQ
- Recommended product
Basic Info.
Product Description
MD New Vertical vortex centrifugal pump
Head: 0-41m
Flow rate:0-500OL/min
Material: GFRPP, PVDF
Voltage: 220V/380V
Features
Large flow: The scroll flow channel design of the front cover increases the flow
High pressure: The new one-piece impeller design, the pressure can reach 4.1 kg
Efficient and stable: Brand motor is adopted, and the motor shaft is integrally formed and processed
MD series Idling upright acid and alkali resistant pump
Head: 0-36m
Flow rate: 0-1830L/min
Material: GFRPP, PVDF
Voltage: 220V/380V
Features
TECO and Toshiba brand motors
Excellent corrosion resistance of GFRPP and PVDF materials
One-piece design, higher strength and longer service life
Triple protection design for longer life
MIT New Vertical Vortex trough internal pump
Head:0-41m
Flow rate:0-500OL/min
Material: GFRPP, PVDF
Voltage:220V/380V
Features
Stainless steel long shaft motor makes the pump run efficiently and stably
The advantages of corrosion resistance of GFRPP and PVDF materials Front cover scroll flow channel design increases flow One-piece impeller design increases pressure
MIT trough internal vertical pum
Head: 0-39m
Flow rate:0-1800L/min
Material:GFRPP, PVDF
Voltage: 220V/380V
Features
Low noise
No blockage
High efficiency
Energy saving and environmental protection
MIT disc pump MDS stainless steel vertical pump MIT continuous plating pump
Payment
GLOYEL accept different kinds of payment,such as T/T, L/C, Western Union, Money Gram.
Shipment
GLOYEL has established long-term and reliable cooperation with professional packing and shipping company.
1.How to buy your interested products?
You can provide us the slurry source, and slurry processing output, flow rate and ground area, material requirements about your project (More details, please contact us).
2.How to pay?
L/C or T/T are acceptable.Usually, 50% payment in advance, 50% payment before delivery.
3.What is the delivery time?
It depends on order quantities. Generally speaking, the delivery time will be within 2months.
4.How to pack the products?
We use standard export package.If you have special package requirements, we will pack as you required, but the fees will be paid by customers.
5.How to install after the equipment arriving destination?
We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you.
6.How long is the validity?
The validity is 12 months after installation.