- Overview
- Product Description
- Product Parameters
- Detailed Photos
- Application
- Company Profile
- Packaging & Shipping
- FAQ
Basic Info.
Product Description
Operate Condition of Submersible Sewage Pump
- WQP water pump belong to submersible pump, so it must be satisfied the working condition of submerging into the water.
- The medium's temperature shouldn't be higher than 50(HTR type can resist 100 degrees)
- Medium's pH level: 3~10(If beyond this range, please choose other types)
- The voltage can be customize 220V/380V/415V/440V/660V(It must be used within the range of plus or minus 5%)
- Before you buy pumps, please inform details including capacity, head, caliber, power etc, so that we can advise you appropriate model.
- (Attention: do not choose the pump that the capacity is too large or the head too height, that may affect its working life.)
Item | Submersible Sewage Pump |
Warranty | 2 years |
Customized support | OEM, ODM |
Brand Name | aikon |
Model Number | WQ |
Related similar type | stainless steel type, Agitating type and cutting impeller type |
Application | Automotive Industry, Commercial Buildings, Industrial Utilities, Irrigation and Agriculture, Mining industry, Raw Water Intake, Wastewater Transport and Flood Control, wastewater treatment, Water Treatment Solutions, sewage system |
Power Source | Electric |
Structure | Single-stage Pump |
Voltage | 220V/380V |
Power | 220V/380V |
motor | induction motor |
Product Installation Instructions
- The pump installation can be divided into three types, movable type, fixed type and coupling type.
- Check whether pump fasteners are loosen and whether the pump body runner is blocked by foreign matters before installation to avoid damage of impeller and pump body in running.
- Supporters for the outlet pipe should be installed separately so that the weight will not be added to the pump so as to prevent it from deformation. The pump base for both movable and fixed installation must be leveled by a level. After the base is ready, install the pump on the base and then use a level to check horizontal and vertical situation between the pump and motor shaft. Use the iron shim to change the height of the base if the pump is out of level. Then grout the base and anchor bolt holes by pouring the concrete into the grout hole.
- The levelness of the coupling device should be calibrated by a level when coupling installation is adopted. Horizontal level tolerance should not exceed 0.1mm/m. Use the measure gage to calibrate parallelism of two coupling rods to ensure the parallelism tolerance will not exceed 0.2mm/m.
Tighten the anchor bolt to make sure there is no looseness between the anchor bolt and concrete in case of bad influence on pump performance when starting. - For easy maintenance and safe use, install a regulating valve on the outlet pipe and a pressure gauge near the outlet to guarantee the normal operation within the rated performance range, which lengthens the lifetime of pumps.
- Rotate the impeller from the suction side after installation. Disassemble the pump and find out the reasons if there is friction or stuck pump.
Q1: What is your product range ?
A: We have the ability to manufacture water pumps of various materials, VFD,valves,etc.And our pumps are including slurry pumps, multi-stage pumps, pipeline pumps,sewage pumps, etc.
Q2: Can you produce according to the samples ?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q3: Is OEM parts available ?
A:Yes, please send me the detailed drawing. Different materials and colors are available.
Q4: how can we guarantee quality ?
A: We Always a pre-production sample before mass production;Always final inspection before shipment;
Q5: What are your advantages ?
A: Rapid development of new products, full range of products, professional service timely quotation and reply promptly, strict quality inspection, strong in after-sales problem solving.